Skip to content
Mutabank Inverter Installation
← All services

Solar

Backup power that pays for itself.

Our 10 kW Mutabank hybrid inverter pairs with 10–50 kWh of stackable lithium battery storage. Solar-first, grid as backup, with seamless transfer when the lights go out.

Pricing
Free quote

Final price after a site assessment

Typical duration
1–3 days

What's included

Everything covered.
No hidden extras.

This is what every mutabank inverter installation engagement with us includes — line by line.

  • Load assessment and battery sizing
  • 10 kW Mutabank hybrid inverter (HC/HP series)
  • Stackable LiFePO4 battery bank (10–50 kWh)
  • Solar PV integration where applicable
  • AC and DC wiring with proper protection
  • Critical loads sub-panel for backup circuits
  • Commissioning, monitoring setup, and walk-through
  • 2-year inverter warranty

How it works

Four simple steps.
You always know what's next.

01

Study

We review your bills and walk through what you actually need to keep running through an outage.

02

Design

We size the battery bank and inverter to your real loads — not a one-size guess.

03

Install

Wall-mount inverter, stackable battery cabinet, critical-loads panel. Typical install: 1–2 days for residential.

04

Commission

Full system test, transfer-time check, monitoring app set up on your phone. We walk you through every mode.

Common questions

Before you book.

Yes. The Mutabank 10 kW hybrid inverter we install is on the JPS-approved interconnection list, compatible with the standard 230/240V single-phase service.

Grid-tie is cheaper but shuts off during JPS outages. Hybrid adds battery storage, costs more upfront, but keeps your essentials running through outages. If JPS reliability is a concern in your parish, hybrid is the better long-term call.

Most customers size for fans, lights, fridge, internet router, and one AC zone — that's typically 5–10 kWh of storage. Whole-house backup including multiple ACs needs 15+ kWh and a careful load study.

10 years on the Mutabank inverter, 10 years on lithium battery cells, 5 years on the battery management system. Plus 5-year labour warranty on our installation work.

Yes — we retrofit hybrid inverters and batteries to existing grid-tie installs regularly. Whether the existing panels and wiring can stay depends on age, condition, and JPS interconnection terms; we assess on-site before quoting.

More on the full FAQ.

Ready to book?

Schedule online or call us directly. Free quotes on every job — no obligation, no pressure.